Water filtration and reuse for apartment communities
One meter, many units and residents who notice every change in their water. The review starts with the meter and the toilets, then looks at treatment and reuse.
For: Apartment owners, property managers and small multifamily landlords

An apartment community pays for water once, at the meter, and hears about it many times: a resident who dislikes the taste, a ceiling stain below a unit nobody reported, a boil-water notice on a Friday night, a bill that jumped with no obvious reason. For apartments, Maredes starts with the meter and the toilets before talking about equipment.
What apartment owners face with water
Most of the water goes to fixtures inside units
EPA WaterSense says toilets account for nearly 30 percent of an average home’s indoor water use and showers nearly 17 percent. The federal standard is 1.6 gallons per flush, older toilets use more, and WaterSense labeled models use 1.28 gallons or less. EPA also estimates that household leaks can waste 180 gallons a week per family. Across dozens of units, a handful of running toilets shows up on the bill.
The meter decides the bill
Many communities share one master meter, so the owner pays for every unit’s use. In Jackson, JXN Water bills combined water and sewer from the meter reading in blocks: from March 23, 2026, $7.48 per CCF (748 gallons) for the first 50 CCF a month, then $14.96, $17.45 and $19.95 per CCF in higher blocks, plus a monthly availability charge set by meter size. Gallons saved come off the highest block first. The availability charge does not change with use.
Older plumbing and lead
EPA names lead pipes, faucets and fixtures as the most common sources of lead in drinking water and says testing is “the only sure way” to know. JXN Water’s 2025 Water Quality Report counted 32,527 service lines of unknown lead status among 63,069 in its surface water system (September 2025 inventory), and JXN notes that the property owner owns the line between the meter and the building. In an apartment community, a lead question is answered with first-draw samples from unit kitchens.
Hot water and Legionella
CDC’s Legionella toolkit asks whether a building has “multiple housing units and a centralized hot water system”. Where the answer is yes, CDC recommends assessing whether the building needs a water management program. A garden community with a water heater in each unit answers differently from a mid-rise with a central boiler plant.
Boil-water notices
When a notice covers the property, residents need to hear it from you. Check JXN Water’s notices and MSDH’s water safety notices for current notices. The boil-water notice checklist covers clubhouse ice machines, fountains and the restart afterward.
Which services fit, and in what order
- Water review. Bills against occupancy, a fixture and leak survey in sample units, the common areas and the mechanical rooms, and a certified lab test.
- Leaks and fixtures. Flappers, fill valves and high-flow fixtures, fixed by your maintenance staff or a plumber. This is often the largest saving and needs no design.
- Drinking water in common areas. Point-of-use units for the clubhouse kitchen, fitness center fountains, bottle fillers and ice machines, certified to the NSF/ANSI standard for each claim the results support. In-unit filters only where results call for them, such as first-draw lead results of concern. See drinking water systems.
- Whole-building treatment where hardness, iron or manganese results justify it, sized to the building’s peak flow. See whole-building filtration.
- Reuse where the building supports it. Condensate from central air handlers and rain from large roofs can feed irrigation. Greywater from showers and bathroom sinks can flush toilets in larger buildings, but it needs separate drain and supply piping, which is far easier in new construction or a gut renovation. NSF/ANSI 350 lists greywater systems for multifamily and commercial buildings as Class C, and on November 21, 2026 NSF’s listing named only a few. See greywater recycling and builders and developers.
What a water review looks at in an apartment community
- Meters and bills. The master meter, any submeters, a separate irrigation meter, and twelve months of use set beside occupied units.
- Sample units. Gallons per flush (often marked on the bowl or inside the tank), a dye test for running toilets, showerheads, aerators and the water heater.
- Common areas. Clubhouse kitchen, laundry room, pool, fitness center and irrigation zones. For residential-size machines, ENERGY STAR puts a certified full-size washer at 14 gallons a load against 20 for a standard one.
- Mechanical rooms. Central water heaters or boilers, booster pumps, backflow preventers and air handlers.
- Samples. A unit kitchen tap and a common-area tap, with first-draw lead and copper samples in older buildings.
What you provide and what you receive
You provide: twelve months of water and sewer bills; the unit count and occupancy by month (counts only, no resident information); access to a sample of units, with notice to residents as your leases require; floor plans or a site plan; any past water tests or utility letters; one contact who knows the property; and a decision on the licensed contractor.
You receive: a written review with a water balance and a leak finding by building; certified lab results explained, with the laboratory’s report attached; findings in order of cost; a reuse screen; and, if you continue, a design, an equipment specification by certification, a contractor bid package, start-up verification and a maintenance log. See engagements.
Example: Sweetgum Court
Example (fictional). Sweetgum Court is a fictional 48-unit garden apartment community with one master meter, a water heater in each unit, a clubhouse kitchen and irrigation on the same meter. Its bills show about 5,400 gallons on an average day, about 217 CCF a month. A planning estimate of about 90 residents at 47 gallons per person a day (the water use calculator default household, with older 1.6-gallon toilets) puts expected use near 4,200 gallons a day. The review treats the gap of about 1,200 gallons a day as the first question: a dye test in every toilet, a night meter reading with irrigation off, and a check of each irrigation zone. If leaks explained all of it, fixing them would avoid about 438,000 gallons a year; at JXN Water’s 151 to 350 CCF block ($17.45 per CCF from March 23, 2026), about $10,200 a year, before any equipment. Greywater was screened and set aside because the buildings have no separate drain piping. Every number here is a planning assumption for a fictional property.
To try your own numbers first, start with the water use calculator and the water review checklist.
Start with a water review.
Tell us about the building: what it is, who uses it, where the water comes from and what you would like to change. We reply with questions and a time to walk the building with you.