Greywater recycling for toilets and irrigation
Shower, bath and sink water treated for toilet flushing or subsurface irrigation, with a water balance, an NSF/ANSI 350 class match and a code path memo.
For: Apartment communities, hotels, and builders planning new or renovated drain piping

Greywater is the lightly used water that drains from showers, bathtubs and bathroom sinks, and sometimes from clothes washers. In EPA’s words, gray water “is wastewater from lavatory sinks, laundries, and bathing. It never contains wastewater from toilets or urinals and excludes wastewater from kitchen sinks.” Treated and disinfected, it can flush toilets or water landscape below the surface. Of the reuse systems Maredes designs, greywater asks the most of a building: separate drain piping to collect it, separate supply piping to deliver it, treatment, disinfection, and an approval that in Mississippi is decided project by project.
When it fits
Greywater works best where supply and demand sit close together in time and place. Showers run in the morning and evening; toilets flush all day. A building with many of both, such as an apartment community, a hotel or a gym with locker rooms, can produce enough each day to cover its own flushing. Toilets are a large demand: WaterSense says they account for “nearly 30 percent of an average home’s indoor water consumption”.
The piping decides most projects. DOE’s federal guidance notes that dual plumbing is easier to install in new construction. A new building, or a renovation that opens every bathroom wall, can run shower and sink drains to a collection tank and a purple supply line back to the toilets. An existing building often cannot do that without opening walls on every floor, and the piping cost can outweigh the water saved.
What it does and does not do
- It does replace city water for toilet and urinal flushing and for subsurface irrigation, the reuse applications EPA lists for systems under NSF/ANSI 350.
- It does not supply drinking, cooking, bathing or hand washing water. Reuse is always non-potable.
- It does not feed spray irrigation. EPA advises that greywater irrigation stay below the surface, that untreated greywater be used within 24 hours, and that owners “consult local health department officials first”.
- It does not take kitchen sink water, which carries grease and food.
- It is not a way to skip disinfection. EPA recommends disinfection “for all water used indoors for toilet flushing or other uses”.
NSF/ANSI 350 and the class that fits
NSF/ANSI 350 “establishes the minimum materials, design and construction, and performance requirements for onsite residential and commercial reuse treatment systems”, and a greywater system can be evaluated for bathing water, laundry water or both. Its listings use two classes: Class R for “single family residential dwellings” and Class C for “multi-family residential units and commercial facilities”. On NSF’s listing current as of November 21, 2026, three manufacturers had greywater systems for laundry and bathing water, and the Class C units were rated from 79 to 7,926 gallons a day.
That is a short list. The specification names the class and the daily capacity the building needs and requires a current listing. Where no listed unit fits the flow, the design says so in writing, and the code path memo takes it to the local official.
How Maredes designs it
The water balance
We compare daily greywater supply (people times shower and sink gallons, minus water lost in treatment) with daily flushing demand (people times flushes times gallons per flush), month by month and across occupancy. The greywater calculator runs the same comparison. A balance that does not work ends the design there, which is a useful answer.
Piping, storage and treatment
Collection drains run separately to a tank and treatment unit. Treated water is stored for about a day, because short storage keeps it fresh. Supply pipes to the toilets are separate and labeled; DOE says reclaimed water pipes “must be color coded with purple tags or tape according to standards set by the American Water Works Association”. City water make-up enters the tank through an air gap or a backflow preventer, and the tank has an overflow to the sanitary sewer. The specification requires lead-free certification for every component that touches the city supply.
The code path memo
EPA lists 12 states with onsite non-potable reuse regulations or guidelines, and Mississippi is not among them. MSDH’s on-site wastewater regulations and the 2018 on-site law contain no greywater or reuse provisions. The 2021 International Plumbing Code has a chapter titled Nonpotable Water Systems, but which code edition applies depends on the city or county. So every greywater design comes with a written memo: who approves it (the local building official and the health department), which code edition applies, backflow protection, labeling, monitoring, and what happens if approval is refused. We make no promise of approval. See standards for the specifications behind it.
Building water safety
Treated greywater tanks are stored water. Each design adds them to the building’s water management program, with control limits and readings, as on the Legionella checklist.
Example (fictional). The greywater calculator’s default example is the fictional Pearlbank Hotel at 70 percent occupancy, about 134 guests, each assumed to use 16 gallons in the shower and 3 at the sink and to flush 5 times a day at 1.28 gallons, with 10 percent lost in treatment. The result is 2,291 gallons of greywater collected and treated per day against 858 gallons of flushing demand: enough to cover 100 percent of flushing, with 1,434 gallons a day left over. On paper, supply was ample. In the hotel’s water review, greywater for toilet flushing was screened and not chosen, because the existing building has no separate drain and supply piping. The plan went to laundry rinse recycling and a rain and condensate tank instead. All figures are planning assumptions.
What you provide and receive
You provide plumbing drawings or as-builts, occupancy by month, fixture counts, the space available for a tank and treatment unit, and a contact at the local building department. You receive the water balance, the NSF/ANSI 350 class and capacity the building needs, the code path memo, and, if you continue to system design, drawings, a specification and a bid package.
Maintenance
Screens and filters are cleaned, the disinfection step is checked (UV lamp or disinfectant residual), the tank is inspected and readings are logged as the memo requires. A service plan covers this work after start-up.
Start with a water review.
Tell us about the building: what it is, who uses it, where the water comes from and what you would like to change. We reply with questions and a time to walk the building with you.