Reuse-ready plumbing for new buildings and renovations

The easiest time to plan water reuse is before the walls close. Separate drains, a non-potable supply riser and a room for the tank are simple to draw and hard to retrofit.

For: Builders, developers, architects and engineers planning new buildings or major renovations

A wooden carpenter's spirit level lies exactly along the waterline with its bubble vial centered, its top half dry and its bottom half submerged.

In an existing building, greywater reuse usually stops at one obstacle: the shower and sink drains already join the toilet drains, and there is no spare riser to carry treated water back up to the toilets. The Department of Energy’s Federal Energy Management Program notes that dual plumbing is easier to install in new construction. For a new building or a gut renovation, Maredes plans reuse into the design: the pipes, the space and the approval path, even if the equipment comes later.

What builders and developers face

No state reuse rule, so approval is local

EPA’s list of states with onsite non-potable reuse regulations or guidelines (updated June 26, 2026) names 12 states, and Mississippi is not one of them. MSDH’s on-site wastewater regulations and the 2018 on-site wastewater law contain no greywater or reuse provisions that our research found. Approval therefore runs project by project, through the local building official and, where wastewater is involved, the health department. EPA advises consulting local health department officials before installing a greywater system. Local rules apply, and nothing here is legal advice.

Which code applies depends on where you build

According to the ICC, Mississippi adopts codes through the Mississippi Building Code Council; coastal counties must adopt and enforce the state building code, and “elsewhere in the state, enforcement is voluntary but encouraged”. Mississippi adopted the 2024 I-Codes, including the 2024 International Plumbing Code, for modular construction as of July 1, 2026. The International Plumbing Code has a chapter titled “Nonpotable Water Systems”. The code path memo names the edition the local authority actually enforces. In Jackson, property owners or licensed contractors obtain permits before work begins.

Licensed contractors and thresholds

The Mississippi State Board of Contractors licenses Plumbing and Mechanical contractors; the Mechanical classification includes condensate drains from air-conditioning units. Its commercial contractor law does not apply to contracts under $50,000 (with exceptions), and residential builder licensing covers residences over $50,000. Maredes is not a contractor. Licensed contractors install, and a licensed engineer seals drawings where the authority requires a seal.

Equipment that exists today

NSF/ANSI 350 certifies onsite reuse treatment systems in two classes: Class R for single-family homes and Class C for multifamily and commercial buildings. On November 21, 2026, NSF’s listing showed only a few greywater products in Class C, with listed capacities from 79 to 7,926 gallons a day. Maredes specifies a listed unit in the right class where the market offers one, and plumbing components certified lead free under NSF/ANSI/CAN 61 or 372.

What reuse-ready means in the drawings

  • Separate greywater drains from showers, tubs and bathroom sinks (and clothes washers where allowed) to one collection point, kept apart from toilet and kitchen drains.
  • A non-potable supply riser to the toilets, marked with purple tags or tape, which DOE notes is required for reclaimed water under American Water Works Association standards.
  • Condensate lines from air handlers routed to a common point, and roof drains routed toward the tank location.
  • A room or pad sized for a tank and a treatment skid, with a floor drain, power, ventilation and a door wide enough to replace a tank.
  • Backflow protection on every make-up connection from the drinking water system, with an air gap or an approved backflow preventer.
  • Meters and sample ports on each reuse stream, and access for filter, membrane and UV lamp changes.

With these in place, the treatment equipment can be added at turnover or years later.

Which services fit, and when

Design phase What Maredes does What you get
Concept and schematic A water review on paper: occupancy, fixture counts, roof and air-conditioned area A monthly water balance and a yes or no on each reuse source
Design development An early conversation with the building official; riser and room layout A code path memo and space requirements
Construction documents System design: drawings and specification by certification A contractor bid package
Construction and turnover Coordination with licensed contractors; start-up and verification sampling A start-up report, operating manual and maintenance log

The monthly balance uses NOAA’s 1991 to 2020 normals for Jackson, which run from 3.48 inches of rain in September to 5.84 inches in April, so a rain tank is sized for the dry months, not the yearly average. The tank sizing calculator shows the method. A building with a central hot water system and many units also answers CDC’s Legionella questions at design time, so the Legionella checklist belongs in the same meeting.

Example: Redbud Landing

Example (fictional). Redbud Landing is a fictional four-story building with 72 apartments in schematic design. Using the greywater calculator with its default per-person assumptions (16 gallons of shower and bath water, 3 of bathroom sink water, 5 flushes at 1.28 gallons and 10% lost in treatment) and about 130 residents, showers and sinks would yield about 2,223 gallons a day of treated greywater against about 832 gallons a day of flushing demand. That covers flushing with water to spare, about 303,680 gallons of city water a year. The design question is whether to build for it now: separate greywater risers, a purple-labeled supply riser to every toilet and a ground-floor room sized for a tank holding one day of flushing demand plus the treatment skid. A code path memo goes to the local building official before construction documents. Every number is a planning assumption for a fictional building.

What you provide and what you receive

You provide: the design team’s drawings at their current stage; unit mix and expected occupancy; roof area and air-conditioned floor area; the local building official’s contact; and the project schedule.

You receive: a water balance by month; a reuse screen with a recommendation for each source; a code path memo; riser, room and space requirements for the architect and engineers; and, if you continue, a specification by certification and a contractor bid package. No approval, credit or schedule is promised: the local authority decides.

Start with a water review.

Tell us about the building: what it is, who uses it, where the water comes from and what you would like to change. We reply with questions and a time to walk the building with you.