A water review answers two questions for one building: what is in the water, and where the water goes. Most of the answers start with papers the owner already has and a building the owner knows. This checklist lists what to gather before the visit. It is written for owners and managers preparing for a Maredes review, and it works just as well for anyone checking their own building first. Tick items as you gather them, then print or download the list; nothing is saved when you leave the page.
Bills and records
Twelve months of water and sewer bills are the foundation. They show how much water the building uses, how use changes with the seasons, and what each unit costs. A single month that jumps often points to a leak or a stuck irrigation valve. Bring bills that show the meter size and the rate: on JXN Water’s schedule, for example, water and sewer charges are both based on water meter readings, the usage rate rises in blocks by CCF (748 gallons), and each meter carries a monthly availability charge set by its size. If the property has a separate irrigation meter, bring those bills too.
Utility papers come next. Every community water system must send customers a Consumer Confidence Report each year by July 1, listing the contaminants it detected and how they compare with federal limits; MSDH posts recent Mississippi reports. Bring any boil-water notices and any letter about your service line: under EPA’s Lead and Copper Rule Improvements, water systems must identify and replace lead pipes within 10 years.
For a private well, bring the well log, the depth and every past test. For any building, note recent plumbing work, the water heater’s age and any treatment equipment already installed, with model numbers if you have them.
The building
The review builds a water balance: how many gallons enter on an average day and roughly where they go. That needs:
- Floor plans or a sketch showing bathrooms, kitchen, laundry, mechanical room and roof drains. A hand sketch is fine.
- Occupancy: occupants, rooms, seats or beds, and the busiest days.
- Cooling equipment with tonnage, if you are considering condensate capture. Add the air-conditioned floor area each air handler serves: EPA’s planning range for condensate, 3 to 10 gallons per day per 1,000 square feet, is stated per floor area.
- Roof area and downspouts, if you are considering rainwater. EPA’s rule of thumb is 0.62 gallons per square foot of roof per inch of rain.
- Space for equipment: a closet, mechanical room, garage wall or pad outside, with rough dimensions.
What you notice
Complaints point to tests. Staining suggests iron or manganese; scale on fixtures, short water heater life or clogged filters suggest hardness or sediment; a taste or odor narrows the list further. Note where each problem occurs: a problem at one tap may start in that tap’s own plumbing.
Note low pressure and running toilets too. Fixes like these usually come first in a review’s findings, because they cost less than any equipment.
Example (fictional). In the example project, the written review for the Pearlbank Hotel, a fictional 96-room hotel, found two running toilets. Hotel staff fixed them before any design began.
Finally, write down what you want: better drinking water, lower bills, less scale, reuse, or all of these. The answer shapes the sampling plan.
Access on the day
The visit is a walk from the meter to the roof. It needs access to the water meter, the main shutoff and the mechanical room, a person who knows the building, and permission to take photos and to sample water from at least two taps. Samples go to a laboratory certified for drinking water analysis, chosen for the tests the building needs.
Before you call
You can run your own numbers with the water use calculator or, for a hotel, Where hotel water goes. How we work explains every stage after the review, and engagements explains what a review delivers on its own. When the list is ready, get in touch.
Start with a water review.
Tell us about the building: what it is, who uses it, where the water comes from and what you would like to change. We reply with questions and a time to walk the building with you.