Six stages, each ending in a document you keep. You can stop after any of them.

For: Owners, managers and builders planning water treatment or reuse for one building

Six smooth river stones lie in a gently curving line along a pale ledge that slopes into the water, the first three dry above the waterline and the last three resting below the surface.

Every Maredes project moves through the same six stages, in the same order. Each stage ends with something written that you keep, so you always know what was found, what was decided and why. Nothing is designed before the water is tested, and nothing is installed before the design is on paper. You can stop after any stage and take the documents with you.

The six stages at a glance

Stage What happens Who does the work What you receive in writing
1. Water review Bills, meters, fixtures and equipment, occupancy, a walk from the meter to the roof Maredes, with your building contact Visit notes and photos, an equipment list, a first water balance from the bills
2. Sampling and lab tests A sampling plan, samples at the taps that matter, laboratory analysis Maredes samples; a certified laboratory analyzes The sampling plan, the laboratory’s report, and the written water review with results explained
3. System design Treatment matched to the results; for reuse, a monthly water balance and the approval path Maredes; a licensed engineer seals drawings where the local authority requires it Drawings, an equipment specification, code notes, a code path memo for reuse, a contractor bid package
4. Installation Permits, then installation to the specification Licensed plumbing and mechanical contractors; the local building official inspects Permit and inspection records, the installed equipment list, marked-up drawings
5. Start-up and verification Flushing, settings, verification sampling compared with the baseline Maredes with the contractor; the laboratory analyzes A start-up and verification report and an operating manual
6. Monitoring and service Filter, membrane and UV lamp changes, readings, sampling Maredes, under a service plan A maintenance log and periodic plain-language reports

Stage by stage

1. Water review

We read twelve months of water and sewer bills, then walk the building with someone who knows it: the meter, the water heater, any treatment already installed, the laundry and kitchen, the air handlers and their condensate lines, the roof drains and downspouts, and the space where equipment could go. The bills give a first water balance: how many gallons arrive on an average day and roughly where they go. The water review service page describes the visit in detail.

2. Sampling and lab tests

We write a sampling plan (which taps, which tests, which laboratory, which day) and take the samples. A laboratory certified for drinking water analysis does the testing. MSDH publishes the in-state laboratories in its certification program and notes that a laboratory’s status may change, so we check the list for each project. For a private well, MSDH tests for bacteria only; minerals and chemicals go to a private laboratory. The written water review follows: the water balance, each result beside the limit that applies, findings in order of cost (leaks and fixtures first), a reuse screen and the questions that remain.

3. System design

Treatment is chosen from the results, not from a catalog. Each component in the specification names the certification it must carry, such as NSF/ANSI 53 for a lead reduction claim or NSF/ANSI 55 for UV, as described on the standards page. For reuse, the design adds a monthly water balance (supply by source against demand by end use) and a code path memo: who approves the system, which code edition applies, backflow protection, labeling and monitoring. The bid package lets licensed contractors price the same scope. See system design.

4. Installation

Licensed contractors install the system. The Mississippi State Board of Contractors licenses plumbing and mechanical contractors; its Mechanical classification covers work such as a condensate drain from an air-conditioning unit. In Jackson, the city says that property owners or licensed contractors are responsible for obtaining permits before work begins and scheduling inspections. Rules differ by town and county, so the design notes which office to call.

5. Start-up and verification

Before the system goes into regular use, lines are flushed, settings are recorded and verification samples go to the laboratory. The results are compared with the baseline from stage 2, and the report says plainly whether each one matches what the design intended. If one does not, the report says what happens next.

6. Monitoring and service

Cartridges load, membranes foul and UV lamps lose output whether or not anyone is watching. The service plan sets the schedule for changes, readings and sampling, and every visit goes into the maintenance log. See monitoring and service and the printable filter maintenance log.

Who does what

Party Does Does not
Maredes Reviews the building, plans and takes samples, designs, specifies, writes the code path memo, checks start-up, services the system Analyze samples, do plumbing or electrical work, sell a house brand, seal drawings
Certified laboratory Analyzes samples by certified methods and issues its own report, which you receive unedited Recommend equipment
Licensed contractors Bid, pull permits, install, and correct their work Change the specification without a written approval
Local building official Reviews permits, inspects, and decides on reuse approval (with the health department where wastewater is involved) Endorse a designer or a product
You, the owner Provide records and access, choose the contractor, make each go or stop decision Need to manage the laboratory or the paperwork alone

Code enforcement is local in most of Mississippi. The ICC notes that coastal counties must adopt and enforce the state building code, while elsewhere enforcement is voluntary but encouraged. That is why every design names its approving office instead of assuming one.

What you provide and what you receive

You provide: twelve months or more of water and sewer bills; access to the meter, the equipment room and the roof; one contact who knows the building; floor plans or a sketch and any past water tests; the well log, for a private well; laundry pounds per day, air-conditioned floor area and roof area, for reuse; and a decision on the licensed contractor (your own, or a request for bids). The water review checklist lists it all.

You receive: a written water review and water balance; certified laboratory results explained in plain language with the laboratory’s report attached; a design with drawings, an equipment specification naming the certification each component must carry, and code notes; a code path memo for reuse; a contractor bid package; a start-up and verification report; and a monitoring and service plan with a maintenance log.

Each engagement is quoted in writing before work starts. The engagements page shows how the stages are grouped into engagements, and the example project follows one fictional hotel through all six.

Start with a water review.

Tell us about the building: what it is, who uses it, where the water comes from and what you would like to change. We reply with questions and a time to walk the building with you.