Maredes homeRequest a water review
Menu

Is it legal to collect rainwater or reuse greywater in Mississippi?

The reader questionCan a Mississippi home or business legally collect rainwater or reuse greywater, and which permits or codes apply?

A brass spigot mounted on the curved wooden staves of a rain barrel sits dry above the waterline, while the barrel's dark wood and iron hoop continue below the surface.

We found no Mississippi statute, regulation or agency page that prohibits collecting rainwater from a roof, and none that creates a permit for a rain barrel or a rooftop cistern. Greywater is different: Mississippi has no state rule written for greywater reuse, and the health department’s on-site wastewater rules count bath and laundry water as wastewater, so any reuse goes through the local building official and, where wastewater leaves the building, the health department. For both, the plumbing code your city or county has adopted governs anything connected to a building’s piping, and approval is decided project by project. This article is general information, not legal advice.

The pages that rank for this question are mostly machine-written summaries that contradict each other and cite no Mississippi source. Maredes, a Jackson, Mississippi company that designs water treatment and reuse systems for one building at a time, writes a code path memo for every reuse project, and this article follows the same order: federal guidance, state water rights, state health rules, code adoption, then local permits. What the plumbing code itself requires inside a building is covered in our guide to greywater and plumbing codes.

Rainwater and greywater pass through four layers of rules, and each layer is run by a different office. The table summarizes what the primary sources say; the chapters that follow give the detail and the citations.

LayerWhoWhat the sources sayWhat it means for a project
FederalDOE, EPARainwater harvesting "is not regulated by the federal government"; states regulate it. EPA's list of states with onsite non-potable reuse rules does not include MississippiNo federal permit for a rain barrel or cistern; federal guidance points to state and local rules
State water rightsMDEQ Office of Land and Water ResourcesPermits groundwater withdrawals and surface water diversions or impoundments; the permit page and regulation text do not mention rooftop rainwaterRoof collection is not named; diversions for a single residence are exempt; dams and large uses need MDEQ's view
State healthMSDH on-site wastewaterWastewater includes "bath and toilet waste, residential laundry waste"; no greywater provisions were foundGreywater leaving a building to the ground is a health department question
CodesMississippi Building Code Council; local governmentsCoastal counties must enforce the state code; elsewhere enforcement is voluntary; 2024 IPC adopted for modular construction from July 1, 2026The edition your jurisdiction enforces decides indoor reuse requirements
LocalCity or county building official; licensed contractorsPlumbing and mechanical permits; owners or licensed contractors pull themAnything tied into building piping needs the local permit path
Sources: DOE FEMP Best Management Practice 14; EPA Onsite Non-Potable Water Reuse Resources; MDEQ water use permit page and 11 Miss. Admin. Code Pt. 7, Ch. 1; MSDH On-Site Wastewater Regulations; ICC Mississippi adoption page and ICC-NTA notice; City of Jackson permits page. Checked November 22, 2026. Not legal advice.

Two principles hold across every layer. First, the office that decides is the one closest to the project: the building official for anything connected to building piping, the county health department for wastewater, and MDEQ for wells, streams and dams. Second, reuse water in these projects is non-potable, used for irrigation, toilet flushing or cooling, and kept apart from the drinking water piping; once rainwater is meant for drinking, a different set of rules applies.

The federal layer: no rainwater rule, and guidance that points elsewhere

There is no federal permit for collecting rainwater. The Department of Energy’s Federal Energy Management Program says so directly and sends readers to state rules and local plumbing codes.

FEMP’s Best Management Practice 14, updated September 16, 2026, says: “Rainwater harvesting is not regulated by the federal government. Individual states regulate the collection and use of rainwater.” It also says rainwater systems “may require a permit from local or state government” and advises owners to “Plan for this requirement early”. FEMP’s Alternative Water Supply Tool adds that “Some states limit rainwater harvesting” and that “Rainwater harvesting permits may be required; check with local or state government.”

For greywater, the same FEMP page says systems “should also be installed in accordance with local plumbing codes and by professional, licensed plumbing contractors”, that local requirements may include “Backflow preventers to ensure the proper separation of potable water and graywater supply system”, and that greywater for irrigation should not be sprayed but “injected directly into the soil through drip irrigation”. FEMP defines greywater as water from “bathroom sinks, showers, and clothes washing machines”, not from toilets, urinals or kitchens.

Roof water, ground runoff and condensate are treated differently

FEMP separates rainwater from stormwater. Rainwater harvesting is collection “from rooftops or other covered surfaces”; stormwater harvesting collects runoff “from ground-level hard surfaces rather than from roofs”, needs more treatment, and may face “local limitations on the storage and reuse of stormwater and/or there may be permit requirements from local or state governments”. EPA’s WaterSense guidance makes the same point about quality: runoff from the ground “is much more variable than that collected from rooftops, because it can pick up pollutants as it travels across the landscape”. A parking lot pond is therefore a bigger regulatory and treatment question than a gutter and a tank.

Air-conditioning condensate is a third source that Mississippi buildings have in quantity. FEMP says “A large amount of condensate can form on cooling coils in areas with hot, humid summers such as the southeastern United States”, calls it ideal for cooling tower make-up, and warns that it “can potentially grow bacteria during the storage phase, requiring disinfection”. The state’s contractor classifications already recognize condensate piping: the Mechanical classification includes installing a “condensate drain from an air-conditioning unit to an existing safe waste or other approved disposal other than a direct connection to a sanitary system”. Reusing it follows the same layers as rainwater: no federal rule, no state rule written for it, and the local plumbing code for anything piped into the building.

EPA’s list of states with reuse rules

EPA’s onsite non-potable reuse page, updated June 26, 2026, lists the states that have developed guidelines or regulations for onsite non-potable reuse: California, Colorado, Florida, Georgia, Hawai’i, Minnesota, New Mexico, Ohio, Oklahoma, Oregon, Texas and Wisconsin. Mississippi is not on it. That does not make reuse illegal here; it means there is no state framework to follow, so each project has to show the local authorities how it protects the drinking water supply and public health. EPA points to national guidance for that purpose, including the 2020 Onsite Non-Potable Water System Guidance Manual and its 2025 Risk Based Framework.

When rainwater becomes drinking water

Treating rainwater to drinking water standards is a different matter. EPA defines a public water system as one that provides water for human consumption to at least 15 service connections or an average of at least 25 people for at least 60 days a year, and that definition does not depend on the source. A business that supplied rainwater for drinking to that many people would be a regulated water system, and MSDH’s Bureau of Public Water Supply is the office to ask. Maredes designs reuse for non-potable uses only.

The state water-rights layer: what MDEQ permits, and what it does not mention

Mississippi regulates the use of its water through permits from the Mississippi Department of Environmental Quality. Those permits are written around wells, pumps and dams, and the sources we read do not mention rooftop rainwater at all.

MDEQ’s Water Availability and Use page says its Office of Land and Water Resources handles the “Issuance and renewal of permits related to the withdrawal of groundwater and diversion or impoundment of surface water”. Its forms page lists applications for groundwater withdrawal and surface water diversion and notes that, effective July 1, 2026, “there are no permit fees associated with groundwater or surface water withdrawal permits”.

What the regulation says

The regulation MDEQ posts on that forms page, 11 Miss. Admin. Code Part 7, Chapter 1, is broad. It says “All water, whether occurring on the surface of the ground or underneath the surface of the ground, has been declared by statute to be among the basic resources of this state”, and that no one not exempted “shall initiate actions to use water without having first obtained a permit”. It defines surface water as “water occurring on the surface of the ground” and a diversion as “the act of bringing surface water under control by means of a well, pump, dam or other man-made device for delivery and distribution for a proposed beneficial use”.

The same regulation exempts “Diversions when the water is to be used for domestic single-residence purposes”, and defines domestic use to include “ordinary household purposes” and “the irrigation of home gardens and lawns”. Groundwater wells “used for domestic purposes and providing potable water to only one (1) household” are exempt from withdrawal permits too. A text search of the regulation found no mention of roofs, rain barrels or cisterns.

Wells and ponds on the same property

Many rural properties that collect rainwater also have a well or a pond, and those are what MDEQ’s rules are written for. The regulation exempts from withdrawal permits wells “used for domestic purposes and providing potable water to only one (1) household” and wells “with a surface casing diameter less than six inches”, with some exceptions for prohibited uses and reporting. It adds that an exemption “shall not relieve the owner of responsibility for complying with other applicable state or federal regulations”, and that wells of any size that are part of a public water system must meet those requirements. A farm or business that tops up a rainwater tank from a larger well, or pumps from a stream, is in permit territory even if the rainwater part is not.

What that leaves open

The regulation does not say whether water caught on a roof before it reaches the ground is surface water or a diversion. For a household rain barrel watering a garden, the single-residence exemption covers the uses the regulation names. For a business, an apartment community or a farm planning large storage, and for anyone building a pond or dam, the question belongs with MDEQ’s Office of Land and Water Resources before construction. The regulation also requires a permit for storage behind a dam “prior to commencement of construction of the dam”. We could not read the underlying statute, Miss. Code Ann. Section 51-3-1 and following, because the copy we tried to open was blocked, so this article relies on MDEQ’s regulation and pages.

The state health layer: greywater counts as wastewater

Greywater is not a separate category in Mississippi’s on-site wastewater rules. The State Department of Health’s regulations define wastewater to include bath and laundry water, so reuse that sends greywater into the ground is a health department matter.

MSDH’s On-Site Wastewater Regulations (Title 15, Part 18, Subpart 77) define wastewater as “human body waste and wastewater, including bath and toilet waste, residential laundry waste, residential kitchen waste, and other similar waste from appurtenances at a residence or establishment”. A text search of those regulations and of the 2018 law that reenacted the Individual On-Site Wastewater Disposal Law (House Bill 331) found no provisions for greywater, graywater or reuse; the word “gray” appears only in soil descriptions. That absence was found in those two documents only, not in every Mississippi rule.

Why that matters in practice

Greywater systems on homes elsewhere often send laundry or shower water to mulch basins or drip lines. In Mississippi no state rule describes such a system, and the wastewater definition covers the water it would carry. EPA’s WaterSense at Work guidance says greywater “should always be used within 24 hours of collection”, should be applied for irrigation “only below the surface”, should “never be used on plants intended for human consumption”, and that anyone considering a treatment system should “consult local health department officials first to ensure that the system meets appropriate regulations”. In Mississippi that means the county health department, under MSDH, before anything is built.

Why health officials ask hard questions about greywater

FEMP says greywater “will often contain detergents, dissolved and suspended solids, and pathogens”, and WaterSense says it “can foster bacteria and pathogens” if stored. FEMP’s list of precautions reads like a health inspector’s checklist: keep storage tanks closed, prevent “pathogenic organisms from contacting humans or animals”, never spray it, apply it through drip lines below the surface, and use cleaning products without sodium, chlorine or boron if the water goes to plants. Its maintenance list includes inspecting for leaks and blockages, cleaning and replacing filters, replacing disinfectant, checking controls and flushing the whole system. An owner who arrives at the health department with answers to each of those points is having a different conversation from one who arrives with a product brochure.

Greywater that stays inside a building for toilet flushing never reaches the ground, so the plumbing code and the local building official lead. Where a building is on a septic system, any change to what flows into it is also a health department question.

The code layer: who adopts plumbing codes in Mississippi

Indoor reuse is governed by the plumbing code, and in Mississippi the code that applies depends on where the building is. The state adopts codes; most local governments decide whether to enforce them.

The International Code Council’s Mississippi adoption page says the state adopts building codes “through the Mississippi Building Code Council (MBCC)”, which is also the plumbing code adoption agency. It says “all coastal counties are required to adopt and enforce the state building code due to hurricane and wind risks”, and that “Elsewhere in the state, enforcement is voluntary but encouraged, leading to a mix of adoption levels”. An ICC National Technical Assessment notice of July 20, 2026 says Mississippi “has adopted the 2024 I-Codes for modular construction as of July 1, 2026”, including the International Plumbing Code, 2024 edition.

What the plumbing code covers

The International Plumbing Code has a chapter on nonpotable water systems covering greywater, rainwater and reclaimed water. ICC’s 2018 IPC Code Essentials summarizes several points: greywater “Cannot be stored untreated in excess of 24 hours”; greywater used for flushing water closets and urinals “must be treated by means of an on-site treatment system that complies with NSF 350”; nonpotable rainwater “is not required to be treated beyond filtration and protection from storage in direct sunlight and circulation to prevent stagnation”; storage tanks must be identified as nonpotable; and a potable makeup connection to a rainwater system must be protected against backflow, where “A physical air gap is the best protection”. The same publication says “even though these systems are addressed in the code, they may not be approved for use locally”. The full requirements, and how a design meets them, are in our guide to greywater and plumbing codes.

Backflow, labeling and the potable rainwater standard

Most of what an inspector checks on a reuse system is about keeping the nonpotable water out of the drinking water. The ICC summary says signage and labeling of nonpotable outlets and piping follow the code’s water supply chapter, that underground reuse piping must be separated from potable piping, and that where a physical connection to the potable supply is unavoidable, “a reduced pressure principle backflow prevention assembly would be the appropriate method of protection”. FEMP lists the same kinds of local requirements: “System inspection after installation to verify compliance”, “Extensive labeling, different piping material, and biodegradable dye”, and backflow preventers.

For rainwater treated to drinking water quality, the code summary says the plumbing code “does not address collection of rainwater for the purpose of treating it to potable water standards”, that such systems “come under the authority of local jurisdictions”, and that ICC and the Canadian Standards Association developed CSA B805-18/ICC 805-2018, Rainwater Harvesting Systems, an ANSI standard that “includes provisions necessary for treating rainwater for potable use”. A jurisdiction may accept it where it has no rule of its own.

Purple pipe and the color code

Nonpotable piping is identified by color so that no one later connects a drinking fountain to it. FEMP says reclaimed water pipes “must be color coded with purple tags or tape according to standards set by the American Water Works Association”, and that keeping reclaimed water “10 psi lower than potable water mains” helps prevent backflow. Those statements are about utility reclaimed water, but the same idea runs through onsite systems: FEMP describes greywater dual plumbing as “color-coded to identify piping as a graywater source”. Ask the building official which color, labels and signs the adopted code requires, because the answer goes on the drawings and into the contractor’s bid.

What we could not confirm

We could not confirm which plumbing code edition the City of Jackson, Hinds County or other local governments enforce for ordinary buildings; the online city code library we tried was behind a challenge page. Ask your building official which edition applies and whether its nonpotable chapter has been adopted, amended or left out.

The local layer: permits, inspections and licensed contractors

The local building department is where a reuse project is approved or not, and licensed contractors do the work. A rain barrel on a downspout is usually outside that process; a cistern piped to toilets is squarely inside it.

The City of Jackson’s residential permits page lists “plumbing permits” and “mechanical permits” among common permit types and says “Property owners or licensed contractors are responsible for obtaining required permits before beginning work and scheduling required inspections.” It adds that “Work performed without required permits may result in enforcement actions, delays, or additional corrective requirements.” Other cities and counties have their own offices and rules.

Questions to put to the building official

A short written list saves a second meeting. These are the questions we would bring:

  1. Which edition of the plumbing code do you enforce, and is its nonpotable water chapter adopted as written, amended or excluded?
  2. Which permits does this project need: plumbing, mechanical, building for a tank or its foundation, electrical for pumps and controls?
  3. Will you accept a treatment system listed under NSF/ANSI 350 for greywater toilet flushing, and what water quality testing do you expect at start-up and afterward?
  4. What labeling, pipe color and signage do you require at outlets, tanks and valves?
  5. Which backflow assembly do you require on the potable makeup line, and who tests it?
  6. Do you need anything from the health department before you issue a permit?

If you are in one of the coastal counties, where state code enforcement is required, the answers will rest on the state-adopted codes. Elsewhere, a city may enforce a recent edition, an older one or none, and the answers can differ from one town to the next.

Which contractor does what

The Mississippi State Board of Contractors’ classifications describe a Plumbing classification (test required) whose scope includes “sanitary drainage or storm drainage facilities”, “public or private water supply systems” and “irrigation systems”, a separate Irrigation Systems classification, and a Mechanical classification that covers heating, cooling and plumbing work. The Board’s commercial and residential laws, as revised in 2022, set thresholds for when its licenses apply: the commercial law does not apply to contracts under $50,000, a residential “Remodeler” is one working on improvements over $10,000, and a “Residential builder” covers residences over $50,000. Local plumbing licenses and permits can apply below those figures, so ask the building department.

Example (fictional). A developer plans Kittrell Commons, a 48-unit apartment building in a Mississippi city that enforces a recent edition of the plumbing code. The design sends roof rainwater to an underground cistern for toilet flushing, with filtration, disinfection, purple-labeled piping and an air gap on the city water makeup line. Before drawings are final, the developer’s team meets the building official to confirm the code edition and whether its nonpotable chapter applies, asks the county health department whether it has any role since no wastewater leaves the site, and checks with MDEQ that a roof cistern of that size needs no water use permit. Each answer goes into a written code path memo that travels with the bid package, so the licensed plumbing contractor prices the same system the official expects to inspect.

Rain barrels, cisterns and indoor rainwater: what changes with the use

The rules tighten as rainwater moves from a garden barrel toward the inside of a building. Outdoor watering from a barrel touches almost none of the layers; toilet flushing touches the plumbing code and backflow rules; drinking water touches all of them.

Use Main layer What to check
Rain barrel at a downspout, hand watering Local rules, if any Overflow away from foundations and neighbors; a tight lid
Cistern feeding a drip or irrigation system Local permits; MSBOC licensing Whether an irrigation or plumbing permit applies; backflow on any city water makeup
Cistern feeding toilets or a cooling tower Plumbing code; building official Code edition, treatment, labeling, backflow, tank identification
Rainwater treated for drinking Local jurisdiction; possibly MSDH Treatment standard; whether the system becomes a public water system
Large pond or dam to store runoff MDEQ Impoundment permit before building a dam

Mississippi has plenty of rain to work with. NOAA’s 1991 to 2020 normal at Jackson International Airport is 57.35 inches a year, and EPA’s rule of thumb is that “0.62 gallons of water can be collected per square foot of collection surface area per inch of rainfall”, with most installers assuming 80 percent capture. Our rainwater calculator applies that method; its default example, the fictional Pearlbank Hotel’s 18,000-square-foot roof, captures about 512,021 gallons in an average year, about 1,403 gallons a day. Rain arrives in storms, so storage, covered in our guide to rainwater for toilet flushing, decides how much of that a building can use.

What treatment each use needs

FEMP says “The level of treatment required for harvested rainwater depends on how the water will be used.” It says “Minimal treatment is required for irrigation because rainwater is typically free of salts and other harmful minerals”, that “More treatment may be required for other non-potable applications such as cooling tower make-up and toilet flushing”, and that rainwater treated to potable standards “will require comprehensive treatment and disinfection”. EPA’s WaterSense guidance recommends disinfection for pathogens for “all water used indoors for toilet flushing or other uses”. The more treatment a use needs, the more an approving official will want to see in the design and in the maintenance plan.

Why the rules matter to the budget

Permits, labeling, backflow assemblies and testing cost money, and the water they replace is cheap in some cases. In Jackson, for example, JXN Water’s rates charge irrigation-only accounts $3.74 per CCF up to 50 CCF, half the $7.48 combined water and sewer rate in the same block, with 1 CCF equal to 748 gallons. Rainwater that replaces irrigation water saves at the lower rate; rainwater that replaces water used for toilet flushing indoors avoids water and sewer charges on a combined account. Check how your own bill is structured before deciding what the system should supply.

FEMP notes that rainwater “can provide stormwater management by decreasing the amount of runoff flow”. It also notes that systems “require regular O&M”, which matters for permits: an official approving an indoor system will want to know who maintains it.

Greywater uses, from a laundry line to toilet flushing

Greywater reuse ranges from simple outdoor drip lines to treated systems that flush toilets. In Mississippi, the outdoor end of that range runs into the health department’s wastewater rules, and the indoor end runs into the plumbing code.

For a home, the questions are practical before they are legal. Is the house on a city sewer or a septic system? Can the laundry and shower drains be separated from toilet and kitchen drains? Would the water go outdoors, where MSDH’s wastewater definition applies, or to toilets, where the plumbing code applies? WaterSense says untreated greywater should be used within 24 hours and applied only below the surface. FEMP adds that during rainy periods owners should “turn the graywater system off and divert the graywater to the sanitary sewer line”, which in a wet state is a real operating cost.

Example (fictional). The Strayhorn household, on city sewer in a Mississippi town, wants to send washing machine water to the flower beds. Before buying parts, they call the county health department and the town’s building office. The health department notes that the state’s on-site rules count laundry water as wastewater and asks how it would be kept below the surface and away from people; the building office says any new drain connection needs a plumbing permit. Weighing a permit, a licensed plumber and a few gallons of garden water a day, the Strayhorns put a rain barrel on the downspout instead, which neither office regulates in their town, and keep the greywater question for a future renovation.

For apartments, hotels and other larger buildings, treated greywater for toilet flushing is the common use, and the code essentials summary ties it to treatment systems that comply with NSF/ANSI 350. NSF’s listings for that standard sort systems into Class R, for single-family homes, and Class C, for multifamily and commercial buildings. Our standards page explains how Maredes specifies to those listings, and our guide to greywater for toilet flushing covers how such a system works.

What we could not verify, and why it matters

Several pieces of the legal picture could not be confirmed from primary sources during this research. Each is a question to put to the responsible office, in writing, before a design is final.

  • Statute text. We relied on MDEQ’s regulation and pages; the copy of the Mississippi Code we tried to open returned an error, so the statutes behind them were not read.
  • Whether roof water is “surface water”. The MDEQ regulation does not say whether water caught on a roof counts as surface water or its collection as a diversion. For anything beyond a single residence, ask MDEQ’s Office of Land and Water Resources.
  • Local code editions. We could not confirm which plumbing code edition Jackson or any other city or county enforces, or whether it adopted the nonpotable chapter as written.
  • Greywater beyond the two documents. The absence of greywater provisions was found in MSDH’s on-site wastewater regulations and the 2018 law only. Other rules, local ordinances or MSDH policies may address it.
  • The date of the MDEQ regulation file. MDEQ posts the regulation as a file uploaded in 2017; check with MDEQ that it is current.
  • Private restrictions. Homeowners’ association covenants, leases and deed restrictions can limit barrels, tanks or exterior plumbing; they were not part of this research.

Three questions owners often ask

Can I be fined for a rain barrel? We found no state rule that regulates a rain barrel. Local ordinances, homeowners’ association covenants and nuisance rules can still apply, for example to overflow onto a neighbor’s lot or standing water, so ask your city or county if you are unsure.

Can a business share or sell rainwater? Supplying it for drinking to 15 service connections or 25 people can make the business a public water system under EPA’s definition. Non-potable uses inside one building are a plumbing code question for the local official.

Does a reuse system need an engineer’s seal? That depends on the local authority and the size of the project. Where the authority requires a seal, a licensed engineer seals the drawings; ask the building official at the first meeting.

None of these gaps means a project is unlawful. They mean the project’s approval rests on answers from the officials who decide, which is why we treat a written record of those answers as part of the design.

How to get a project approved: a step-by-step path

Whoever decides, the order of questions is the same. Start with the use, then ask each office the question that belongs to it, and write the answers down.

  1. Define the source and the use. Roof rainwater, condensate or greywater; for irrigation, toilet flushing, cooling or something else. Reuse at Maredes is always non-potable.
  2. Size it. Supply and demand by month decide tank size and whether the project is worth doing. The rainwater calculator gives a first estimate.
  3. Ask the building official which plumbing code edition applies, whether its nonpotable chapter is in force or amended, and which permits and inspections the project needs.
  4. Ask the county health department whether it has a role, especially for greywater, for any discharge to the ground, and for buildings on septic systems.
  5. Ask MDEQ only if the project involves a well, a pump from a stream or pond, a dam, or very large storage beyond a single residence.
  6. Choose licensed contractors in the classifications the work needs, and decide who pulls the permit.
  7. Write it down. A code path memo lists who approves the project, which code edition applies, and how backflow, labeling, treatment and monitoring are handled. Maredes writes one for every reuse design as part of system design.
  8. Plan the upkeep that the approval assumes: filter changes, disinfection checks, tank cleaning and records.

What a code path memo records

FEMP’s advice is to “Work closely with the local permitting office early to give ample time to complete this process”, and to have “trained, onsite personnel or a maintenance contract in place” because ongoing operation and maintenance “is critical to making sure these systems continue to operate as designed”. A code path memo turns that advice into a document. It names who approves the project (the building official and, where wastewater is involved, the health department), which code edition applies, how backflow protection, pipe labeling, treatment and disinfection are handled, what monitoring and records the owner will keep, and which questions remain open. It is written before bids, so contractors price what the official expects, and it is updated when an official’s answer changes the design. It is a planning record, not an approval: only the authorities named in it can approve the project.

Builders planning reuse in new construction can find more on dual plumbing and space planning in our page for builders and developers, and on roof and condensate systems in rainwater and condensate capture. To talk through a project and the approvals it would need, get in touch. More articles on codes and rules are on the standards and rules hub.

Have a building in mind?

If this article describes a question about your home, property or business, tell us about the building. A project starts with a water review and a written summary of what we found.