System design and contractor bid packages
Drawings, an equipment specification by certification, a water balance, a code path memo and a contractor bid package for one building's water system.
For: Owners, property managers, architects and builders planning treatment or reuse

System design turns a water review into documents a licensed contractor can price and build from. It answers three questions in writing: what equipment the building needs and why, where it goes and how it connects, and who has to approve it. Maredes designs and specifies; it does not manufacture equipment, sell it or install it. Licensed plumbing and mechanical contractors do the installation, under permits, from the package described here.
What the design package contains
- Drawings. A process schematic from source to use, an equipment layout in the room with service clearances, piping connections, sample ports, drains and power needs. For reuse, the separate non-potable piping route and where its labels go.
- An equipment specification by certification. Each component is described by what it must do and the certification it must carry, not by brand, so that more than one product can usually meet it.
- A water balance. For reuse, monthly supply by source against demand by end use, from NOAA rainfall normals and the building’s own bills and equipment data, with a “do nothing” line for comparison.
- A code path memo. For every reuse system: who approves it, which code edition applies, backflow protection, labeling, monitoring, and what happens if approval is refused.
- A contractor bid package. Scope of work, drawings, specification, the submittals each bidder must provide (product data with the certification listing), start-up and verification requirements, permit responsibilities and a bid form.
- A start-up and verification plan and a draft maintenance plan, so the monitoring and service stage begins with the same targets.
How the specification is written
| Component | What the specification requires |
|---|---|
| Point-of-use filter with a lead claim | Certified to NSF/ANSI 53 for lead reduction, confirmed in the listing |
| Reverse osmosis unit | NSF/ANSI 58, with each needed claim listed |
| UV disinfection unit | NSF/ANSI 55 |
| Water softener | NSF/ANSI 44 |
| Carbon filter for taste and odor | NSF/ANSI 42 |
| Commercial or food service treatment equipment | ASSE 1087, where it applies |
| Greywater treatment unit | NSF/ANSI 350, Class R or Class C to fit the building |
| Pipe, fittings, valves and faucets carrying drinking water | NSF/ANSI/CAN 61 or 372 (lead free) |
| Reuse piping | Purple, labeled non-potable |
| City water make-up to any reuse tank | An air gap or a backflow preventer |
The standard titles come from NSF’s listings. DOE’s federal guidance says reclaimed water pipes “must be color coded with purple tags or tape according to standards set by the American Water Works Association”, and that local requirements may include backflow preventers. These are requirements we place on equipment, not certifications held by Maredes. The standards page explains each one.
Codes, permits and who approves
Which code applies. Mississippi adopts codes through the Mississippi Building Code Council. According to the International Code Council, coastal counties must adopt and enforce the state building code. “Elsewhere in the state, enforcement is voluntary but encouraged.” ICC-NTA reported on July 20, 2026 that Mississippi adopted the 2024 International Codes, including the 2024 International Plumbing Code, for modular construction as of July 1, 2026. The edition that applies to your building depends on your city or county, and the memo names it.
Permits. The City of Jackson states: “Property owners or licensed contractors are responsible for obtaining required permits before beginning work and scheduling required inspections.” Other jurisdictions set their own rules.
Licenses. The Mississippi State Board of Contractors licenses the trades that build these systems. Its Plumbing classification covers “public or private water supply systems” and irrigation systems; its Mechanical classification covers HVAC and plumbing, including condensate drains. The commercial contractor law applies to contracts of $50,000 or more, with exceptions, and the residential law defines a remodeler as one undertaking improvements to an existing residence costing more than $10,000. The contractor confirms that their license fits the job. This is general information, not legal advice; local rules apply.
Seals. Where the local authority requires an engineer’s seal on drawings, a licensed engineer seals them. Maredes does not provide a seal.
Reuse approval. EPA’s list of states with onsite non-potable reuse rules or guidelines does not include Mississippi, so approval of a reuse system is decided project by project. The code path memo is written for the local building official and, where wastewater is involved, the health department. We do not promise an approval.
Example (fictional). For the fictional Pearlbank Hotel, the written review came on day 21 and system design ran from day 22 to day 60. The package specified simple laundry rinse recycling, saving about 400 gallons a day, and a rain and condensate tank of about 10,000 gallons feeding drip irrigation, with filtration and UV because the drip lines run near guest paths. It recorded why greywater for toilet flushing was screened and not chosen: the existing building has no separate drain and supply piping. A code path memo went to the local building official. Bids from licensed plumbing and mechanical contractors came in from day 61 to day 75, and installation with permits ran from day 76 to day 110. The planned result is 1,300 gallons a day of city water replaced. Every figure is a planning assumption; the example project has the full walkthrough.
What you provide and receive
You provide the water review results, any drawings or as-builts, photos, access for measurements, one decision-maker, any contacts you already have at the building or health department, and a decision on the contractor: your own, or a request for bids. You receive the six documents listed above, in a form your contractor and your local official can read.
After design
With a design package, you hire the licensed contractor and the package goes to bid. With design and installation, Maredes coordinates the licensed contractors through installation, start-up and verification, the operating manual and the first service visits. Each engagement is quoted in writing before work starts. See engagements for both and how we work for every stage. Builders planning a new building can read builders and developers, because reuse piping and tank space are easiest to plan before the walls close; DOE notes that dual plumbing is easier in new construction.
Start with a water review.
Tell us about the building: what it is, who uses it, where the water comes from and what you would like to change. We reply with questions and a time to walk the building with you.