The International Plumbing Code (IPC) covers greywater and rainwater reuse inside buildings in Chapter 13, “Nonpotable Water Systems.” For greywater used to flush toilets and urinals, the code’s core requirements are treatment by an onsite system that complies with NSF/ANSI 350, a limit of 24 hours on holding untreated greywater, minimum disinfection and filtration, nonpotable labeling of pipes, outlets and tanks, and backflow protection wherever city water connects. Which edition applies, and whether a system is approved at all, is decided by the jurisdiction where the building stands.
This article turns that chapter into a checklist an owner, designer or contractor can use before a plan review. It is based on the code text we could actually load from the International Code Council (ICC), notes plainly where we could not, and explains the rewrite of Chapter 13 that ICC committees took up in 2024. It is general information, not legal or engineering advice; the local building official and health department decide.
What the plumbing code covers, and which edition applies
Chapter 13 of the IPC governs systems that collect, treat, store and distribute nonpotable water on a building site: greywater, rainwater and reclaimed water from a utility. It does not make any system legal by itself. The code applies only where a state or local government has adopted it, in the edition it adopted, with any local amendments.
ICC’s online code library confirms the chapter title in the 2021 edition: “Chapter 13 Nonpotable Water Systems”. The section text on that site is rendered by script and did not load for this article, so we relied on two other ICC publications:
- ICC’s 2018 IPC Code Essentials, a plain-language companion to the 2018 code, whose water reuse pages summarize the greywater rules (ICC, 2018 IPC Code Essentials).
- ICC’s April 2024 code change book, which reprints the 2024 IPC’s Chapter 13 inside proposal P157-24 with proposed deletions and additions marked (ICC, 2024 Group A proposed changes to the IPC). Where the 2024 wording below is quoted, it is text that reads as the existing code in that reprint. Where deletions and additions could not be separated reliably, we describe the requirement in general terms instead.
One- and two-family homes usually fall under the International Residential Code instead, which carries parallel nonpotable water sections; ICC’s Code Essentials cites Sections P2910 and P2911 for the 2018 edition. If your jurisdiction has adopted a different model plumbing code, the requirements and section numbers differ, and this article does not cover them.
Section numbers change between editions
The same requirement can sit under different numbers in different editions. ICC’s 2018 Code Essentials cites Sections 1301.1, 1301.2, 1302.5 and 1302.6 for the greywater treatment and storage rules, while the 2024 text reprinted in ICC’s proposal puts the NSF/ANSI 350 flushing rule in Section 1302.6.1 and the 24-hour limit in Section 1302.6. A submittal that cites the wrong edition invites questions, so the code path memo should name the edition in force and cite sections from it. This article uses 2024 numbering, which may not match the edition your jurisdiction enforces.
Which edition applies in Mississippi
Mississippi adopts building codes at the state level “through the Mississippi Building Code Council (MBCC),” and ICC lists the MBCC as the state’s plumbing code adoption agency (ICC, Mississippi). ICC says the MBCC updates codes on a three-year cycle, but “local jurisdictions decide whether to enforce them.” Coastal counties must adopt and enforce the state building code; “elsewhere in the state, enforcement is voluntary but encouraged, leading to a mix of adoption levels across counties and municipalities.”
ICC-NTA reported on July 20, 2026 that Mississippi adopted the 2024 I-Codes, including the 2024 International Plumbing Code, “for modular construction as of July 1, 2026” (ICC-NTA). That adoption concerns modular construction. For a site-built project, the first question for the local building department is which plumbing code edition it enforces, with which amendments. Mississippi’s broader legal picture, including what state agencies regulate, is covered in is it legal to collect rainwater or reuse greywater in Mississippi.
What the code leaves to other authorities
The code says so itself. ICC’s Code Essentials notes that “local laws, ordinances and regulations will likely apply, perhaps through the local health codes and public health authorities,” that a jurisdiction “may require initial testing or ongoing testing and monitoring,” and that “even though these systems are addressed in the code, they may not be approved for use locally.”
In Mississippi, EPA does not list the state among the 12 with onsite non-potable reuse regulations or guidelines (EPA, Onsite Non-Potable Water Reuse Resources). MSDH’s on-site wastewater regulations define wastewater to include “bath and toilet waste, residential laundry waste, residential kitchen waste,” and a text search of them found no greywater provisions (MSDH On-Site Wastewater Regulations). That is why every reuse design from Maredes carries a written code path memo naming who approves it and under which edition.
What counts as greywater under the code
Greywater is wastewater from bathtubs, showers, bathroom sinks and clothes washers. It never includes toilet or urinal waste, and the code and federal guidance also keep kitchen wastewater out. The distinction matters because the code’s treatment and storage rules are written for that cleaner stream.
EPA’s WaterSense at Work guide defines gray water as “wastewater from lavatory sinks, laundries, and bathing,” adding that it “never contains wastewater from toilets or urinals and excludes wastewater from kitchen sinks” (EPA WaterSense at Work, Section 8). FEMP describes it as water “generated by bathroom sinks, showers, and clothes washing machines” that “does not include wastewater from toilets, urinals, or kitchens” (FEMP, Best Management Practice 14).
The 2024 IPC text reprinted in ICC’s proposal lists the allowed sources as bathtubs, showers, lavatories, clothes washers and laundry trays, among others. It also names water that “shall not be collected for reuse” in an onsite nonpotable system: reverse osmosis reject water, water softener discharge, kitchen sink and dishwasher wastewater, and wastewater from wet-hood scrubbers. An ICC Building Safety Journal article on the rewrite confirms that reverse osmosis reject water “is currently prohibited from being reused” (ICC Building Safety Journal).
For a design, the source list becomes a drawing exercise. Every fixture connected to the greywater collection drain must be an allowed source, and every other fixture must stay on the sanitary drain. A floor drain in a laundry room, a utility sink that someone might use for mop water, or a bar sink in a hotel room are the kinds of connections a plan reviewer looks for.
Subsurface irrigation is a separate path
Not every greywater use goes through Chapter 13’s treatment rules. ICC’s Code Essentials notes that “untreated graywater may be discharged to a subsurface landscape irrigation system in accordance with IPC Chapter 14,” a separate chapter of the code. EPA’s guidance draws the same line between indoor and outdoor use: if treated gray water is used for irrigation, “it should only be applied below the surface and should never be used on plants intended for human consumption or sprayed through conventional sprinkler heads where it has the potential to be inhaled.” EPA adds: “consult local health department officials first.”
FEMP’s guidance for irrigation adds three practical points. Greywater “should not be applied through a spraying device, but rather injected directly into the soil through drip irrigation.” During rainy periods, the system should be turned off and the greywater diverted to the sanitary sewer so it does not pool on saturated ground. And cleaning products containing sodium, chlorine or boron can build up in soil. In a place with Jackson’s rainfall, the diversion valve and its controls are not optional extras.
Treatment: NSF/ANSI 350, disinfection and filtration
For toilet and urinal flushing, the code requires greywater to be treated by an onsite system that complies with NSF/ANSI 350, and it sets minimum rules for disinfectant residual and filtration. Treatment for other uses must deliver the water quality the use requires at the point of use.
ICC’s Code Essentials puts it in one sentence: “Graywater used for flushing water closets and urinals shall be treated by means of an on-site treatment system that complies with NSF 350.” In the 2024 text reprinted in ICC’s proposal, Section 1302.6.1 reads: “Graywater used for flushing water closets and urinals shall be disinfected and treated by an on-site water reuse treatment system complying with NSF 350.” The general rule in Section 1302.6 is that where an application needs disinfection or other treatment, the water “shall be disinfected as needed to ensure that the required water quality is delivered at the point of use.”
What NSF/ANSI 350 is
NSF/ANSI 350 “establishes the minimum materials, design and construction, and performance requirements for onsite residential and commercial reuse treatment systems,” according to EPA, and greywater systems “can be evaluated for treating bathing water only, laundry water only, or both.” NSF’s listings use two classes: Class R for “Single family residential dwellings” and Class C for “Multi-family residential units and commercial facilities” (NSF/ANSI 350 listings).
On NSF’s listing current as of November 21, 2026, greywater units for laundry and bathing water came from three manufacturers. Class C units were rated from 79 to 7,926 gallons a day, and the two Class R units at 52.8 and 260 gallons a day. A specification should name the class, the source water (bathing, laundry or both) and the daily capacity, and the bid should show the exact model on the current listing. Certification belongs to the product and its listed configuration, not to a manufacturer in general.
How to check an NSF/ANSI 350 claim before you submit it
A plan reviewer, or an owner comparing bids, can check a treatment unit in a few minutes:
- Open NSF’s NSF/ANSI 350 listing and note the date it says the listing is current as of.
- Find the exact model number in the submittal, not just the manufacturer’s name.
- Confirm the class: Class C for multifamily and commercial buildings, Class R for single-family homes.
- Confirm the source water the unit is listed for: bathing, laundry, or laundry and bathing.
- Compare the listed gallons per day with the design flow from the water balance.
- Read any footnotes on the listing that limit configuration or components.
If any of these do not match, the claim of compliance does not hold for that building. Where no listed unit fits the flow, the design has to say so in writing, and the local official decides what to accept.
Residual disinfectant and filtration limits
ICC’s Code Essentials says the code “does provide minimum requirements for residual disinfection and filtering in IPC Section 1301.2.” In the 2024 text reprinted in ICC’s proposal:
- Chlorine ceiling. Where chlorine is used, the nonpotable water “shall contain not more than 4 ppm (4 mg/L) of chloramines or free chlorine when tested in accordance with ASTM D1253.”
- Ozone. Where ozone is used, the water “shall not contain gas bubbles having elevated levels of ozone at the point of use.”
- Filtration for flushing. Nonpotable water for water closet and urinal flushing “shall be filtered by a 100-micron (0.1 mm) or finer filter.”
Reclaimed water from a utility is exempt from these two sections. Note that the code sets a ceiling on chlorine, not a minimum residual; how much disinfection a system needs to meet its use is a design and approval question. EPA recommends disinfection “for all water used indoors for toilet flushing or other uses,” and FEMP notes that more sophisticated treatment, such as biological treatment with membrane filtration and UV or ozone disinfection, “may be required if used in public locations.”
Storage: the 24-hour limit and what it means for tank size
The code limits how long untreated greywater may sit: ICC’s Code Essentials says greywater “cannot be stored untreated in excess of 24 hours.” The 2024 text reprinted in ICC’s proposal says nonpotable water “containing untreated graywater shall be retained in collection reservoirs for not longer than 24 hours.” The reason is biology: greywater carries soap, skin and organic matter that bacteria use quickly.
EPA’s guidance sets the same clock for treated water: treated gray water “should always be used within 24 hours of collection, or otherwise properly disposed, because it can foster bacteria and pathogens.” Together they push a design toward small collection tanks, steady throughput and an automatic dump to the sanitary drain when water ages out.
In practice that means:
- Size the collection tank to less than a day of inflow. The greywater calculator reports “storage for one day of flushing demand”; treat that as an upper bound for the treated tank, not a target for the untreated one.
- Add a timed drain-down. Controls should send water older than the limit to the sanitary drain, and the design should show where.
- Plan for low-occupancy days. A hotel at 40 percent occupancy or an apartment building in August produces less greywater, so water sits longer unless the system can run on city make-up and drain its tank.
- Keep an overflow to the sanitary drain. When greywater supply exceeds flushing demand, the surplus leaves by gravity.
Vacancy, holidays and the bypass
The 24-hour limit is easy to meet in a full building and hard in an empty one. A dormitory over winter break, an apartment floor under renovation or a hotel wing closed for the season produces little greywater while the water already in the system keeps aging. The design answer is a bypass: controls that drain stale water to the sanitary drain, close the greywater inlet and supply the toilets from city make-up until normal use returns, then restart treatment before switching back. The operating manual should say who makes that switch and how it is logged. A system that runs on make-up for weeks without anyone noticing saves nothing, so the controls should also report how much city water the reuse side is using.
Example (fictional). Larkhaven Commons is a fictional 72-unit apartment building planned in a Mississippi city, with 144 residents. With 10.6 gallons of shower water per person per day, five flushes at 1.28 gallons and 10 percent lost in treatment, the greywater calculator shows 1,374 gallons collected and treated a day against 922 gallons of flushing demand, with 452 gallons a day left over and 336,384 gallons of city water saved a year. Under the 24-hour limit, the design team sizes the untreated collection tank to hold only part of a day’s inflow, sends the 452-gallon daily surplus to the sanitary drain, and sizes the treated tank at about one day of flushing demand, close to 922 gallons. All figures are planning assumptions for a fictional building.
Separating nonpotable from potable water: backflow, piping and trenches
The code’s second big job is keeping nonpotable water out of the drinking water system. Every connection from city water to a reuse system needs backflow protection, nonpotable piping must be identifiable along its length, and buried nonpotable piping must keep its distance from potable lines and the building sewer.
Backflow protection on make-up water
A greywater system needs city water to keep toilets flushing when greywater runs short, and that connection is the main cross-connection risk. The 2024 text reprinted in ICC’s proposal says that where a potable system is connected to a nonpotable water system, “the potable water supply shall be protected against backflow in accordance with Section 608.” ICC’s Code Essentials explains the preference: “A physical air gap is the best protection, and if a physical connection is necessary, a reduced pressure principle backflow prevention assembly would be the appropriate method of protection.”
FEMP lists “backflow preventers to ensure the proper separation of potable water and graywater supply system” among typical local requirements. A reduced pressure assembly is a testable device, so the operating plan should include its periodic testing as the local water purveyor or code requires.
Piping that cannot be mistaken
FEMP describes the distribution side as “secondary plumbing (called dual plumbing)” that “is color-coded to identify piping as a graywater source,” and lists among possible local requirements “extensive labeling, different piping material, and biodegradable dye to distinguish from the building’s potable system.” For reclaimed water, FEMP says pipes “must be color coded with purple tags or tape according to standards set by the American Water Works Association.” Purple has become the common color for nonpotable reuse piping, and the specification should state the color, the label text and the spacing the local code requires.
Collection piping is a different case. It carries untreated greywater like any drain, and the 2024 text reprinted in ICC’s proposal says additional marking of collection piping “shall not be required beyond that required for sanitary drainage, waste and vent piping.”
Buried piping and separation distances
Underground, the separation rule is specific. The 2024 text reprinted in ICC’s proposal says nonpotable collection and distribution piping and reclaimed water piping “shall be separated from the building sewer and potable water piping underground by 5 feet (1524 mm) of undisturbed or compacted earth,” and that nonpotable piping “shall not be located in, under or above cesspools, septic tanks, septic tank drainage fields or seepage pits.” ICC’s Code Essentials notes these separation rules come from the code’s water supply chapter and are restated in Section 1301.11 for convenience. On a tight site, that 5-foot rule can decide where a reuse tank and its lines go.
Cross-connection mistakes to look for at inspection
Most cross-connection risks come from ordinary plumbing habits applied to the wrong pipe. Before the system goes into service, and again after any renovation, walk the building looking for:
- a nonpotable line teed into a potable branch, or a potable line teed into the purple system to “help” a slow-filling tank;
- a make-up line that discharges below the tank’s overflow level instead of across an air gap;
- hose connections on nonpotable piping without the required outlet sign;
- unlabeled valves on the nonpotable side, especially in shared mechanical rooms;
- a backflow assembly with no record of its last test.
FEMP mentions biodegradable dye among possible local requirements to distinguish nonpotable water from the potable system, which also makes a cross-connection visible at a fixture.
Pressure on the nonpotable side
Booster pumps can push the nonpotable system above normal plumbing pressure. The 2024 text reprinted in ICC’s proposal says that where the pumping system exceeds 80 psi (552 kPa) static, “a pressure-reducing valve shall be installed” to bring distribution piping to 80 psi or less.
Labels and signs a building needs
Nonpotable water systems must be identified at the outlet, along the piping and on the tank, so that no one drinks from them, connects to them by mistake or enters a tank unprepared. ICC’s Code Essentials says signage for nonpotable outlets and labeling of distribution systems follow the code’s water supply chapter, are repeated in Chapter 13 “for the convenience of the user,” and that “storage tanks also need to be identified as nonpotable.”
In the 2024 text reprinted in ICC’s proposal:
- Outlets. Where nonpotable water reaches outlets such as hose connections, hydrants, open-ended pipes and faucets, each outlet is identified with a sign stating that nonpotable water is used for the named application and cautioning users not to drink it. The words must be printed legibly and permanently on a tag or sign of “corrosion-resistant waterproof material” or on the fixture itself.
- Tanks. “Each nonpotable water storage tank shall be labeled with its rated volumetric capacity.” Its contents must be identified as nonpotable with a do-not-drink caution, and any opening large enough for a person must carry a confined space danger marking.
- Piping. Distribution piping is identified as nonpotable under the code’s labeling rules; local codes often add a required color, as FEMP describes.
Labels also protect the people who come later. A plumber replacing a toilet five years after start-up, or a tenant’s contractor adding a sink, may not know the building has two water systems; the labels and signs are what tell them. That is why reviewers look at labeling on the drawings and again at final inspection.
Beyond the code minimum, practical labels help: arrows showing flow direction near valves, a sign at the treatment room door, and a placard at the make-up connection naming the backflow device and its test date. The standards page lists the specifications Maredes writes into every reuse design, including purple, labeled nonpotable piping and backflow protection on every make-up connection.
Permits, tests, inspections and manuals
A greywater system is plumbing work that needs a permit, a licensed contractor, tests before it goes into service and an operating manual left with the owner. The code text sets the minimum; local rules usually add their own steps.
The 2024 text reprinted in ICC’s proposal requires permits for the construction, installation, alteration and repair of nonpotable water systems, with construction documents, engineering calculations and diagrams submitted with the application. FEMP says greywater systems “should also be installed in accordance with local plumbing codes and by professional, licensed plumbing contractors,” and that local requirements may include “system inspection after installation to verify compliance.” In Mississippi, the State Board of Contractors licenses plumbing contractors, and its Plumbing classification covers work on “public or private water supply systems” (MSBOC, Classifications).
The reprinted 2024 text also calls for tests and inspections before use. Collection drain, waste and vent piping is tested under the code’s general test section. Storage tanks are filled to the overflow line, seams and joints are left exposed, and the tank must stay “watertight without leakage for a period of 24 hours,” after which water is added to confirm the overflow drains properly. Make-up water connections, distribution piping and controls are tested as well.
Finally, a detailed operations and maintenance manual “shall be supplied in hardcopy form with all systems,” according to the reprinted text. FEMP’s maintenance list is a useful outline for it: inspect for leaks and blockages, clean and replace the filter, replace the disinfectant, confirm controls work and periodically flush the entire system. The manual is only useful if someone owns it; the site’s system design service describes the documents a design package hands over.
Who does what on a Mississippi project
A greywater project involves more parties than a typical plumbing job, and the code assumes each of them does its part:
- The owner decides to proceed, pays for permits, and keeps the system running and its maintenance records current.
- The designer prepares drawings, the water balance and the specification, and documents how the design meets the adopted code. Where the local authority requires an engineer’s seal, a licensed engineer provides it.
- The licensed plumbing contractor pulls the permit where the owner does not, installs the system and runs the required tests. In Jackson, the city says “property owners or licensed contractors are responsible for obtaining required permits before beginning work and scheduling required inspections.”
- The building official reviews the plans, witnesses tests and inspects before the system is used.
- The health department may set testing or monitoring requirements, as ICC’s Code Essentials anticipates.
- A certified laboratory analyzes any water samples the approval requires.
Maredes works as the designer in that list. It does not install plumbing or analyze samples, and it does not hold or claim any approval on a project’s behalf.
Rainwater under the same chapter
The same chapter covers rainwater systems, with lighter treatment in most cases and an alternative standard. ICC’s Code Essentials says nonpotable rainwater “is not required to be treated beyond filtration and protection from storage in direct sunlight and circulation to prevent stagnation,” and that greywater, by contrast, must be “treated to the level intended for the application.”
For rainwater, the code points to an alternative: the CSA B805-18/ICC 805-2018 Rainwater Harvesting Systems standard, which ICC developed with the Canadian Standards Association and which “includes provisions necessary for treating rainwater for potable use.” The code itself does not address treating rainwater to drinking water standards; such systems “come under the authority of local jurisdictions.” The labeling, backflow and tank rules above apply to rainwater systems too. When rainwater and greywater share a system, the reprinted 2024 text requires it to meet the most stringent requirements that apply to either source.
The proposed rewrite of Chapter 13: what P157-24 would change
ICC committees took up a full rewrite of Chapter 13 in 2024. Proposal P157-24, submitted by ICC’s Plumbing, Mechanical and Fuel Gas Code Action Committee (PMGCAC), would reframe the chapter around “water reuse systems,” add definitions for blackwater, log reduction value, potable reuse, reuse water and water reuse system, and replace source-based rules with water quality tiers set by the end use (ICC, P157-24 Part I). ICC’s Building Safety Journal describes the working group’s proposals as aimed at “the 2027 International Codes.”
Under the proposal, each application gets an exposure category, and each category a quality tier. Flushing toilets and urinals falls in the exposure category for “Aerosolization, or Accidental/Limited Consumption Possible,” which maps to Tier 3: “Compliant with all applicable laws, rules, ordinances and NSF 350.” The current standalone greywater flushing section (1302.6.1) would be deleted, because the tier table would carry the NSF/ANSI 350 requirement. The proposal also adds rules for abandoning a system an owner can no longer maintain, including removing or disabling piping connected to the utility supply and securing the tank.
| Proposed tier | Exposure category | Minimum water quality in the proposal | Examples from the proposal's application table |
|---|---|---|---|
| Tier 4 | Direct public contact or consumption intended | EPA primary and secondary drinking water standards plus log removal of enteric viruses, Giardia and Cryptosporidium | Direct potable reuse; bidets and personal hygiene devices |
| Tier 3 | Aerosolization, or accidental or limited consumption possible | Compliant with applicable laws, rules, ordinances and NSF 350 | Flushing toilets and urinals; decorative fountains; commercial laundries; spray landscape irrigation |
| Tier 2 | Indirect public consumption intended or possible | Compliant with applicable laws, rules, ordinances and fixture or equipment manufacturer requirements | Aquifer recharge; surface water augmentation |
| Tier 1 | Limited contact, no consumption intended | Compliant with applicable laws, rules, ordinances and fixture or equipment manufacturer requirements | Drip landscape irrigation; priming drainage traps; restricted-access landscape irrigation |
Where the proposal stands
At the April 2024 Committee Action Hearings, the IPC committee recommended P157-24 Part I “As Submitted,” by a vote of 10 to 4, with the reason that “this is a big leap forward for water reuse” (ICC, CAH #2 agenda). The proposal then appeared on the October 2024 hearing’s individual consideration agenda with public comments requesting modifications. We could not verify the final action or whether the rewrite appears in a published 2027 IPC. Until a jurisdiction adopts an edition that contains it, the current chapter’s rules govern projects there.
What the rewrite would mean for a project designed today
A project designed now is reviewed under the edition its jurisdiction enforces now, so the current chapter’s requirements are the ones to meet. The proposed approach is still useful as a design check. It asks the same question for every source: who is exposed at the point of use, and what water quality does that exposure call for? For toilet and urinal flushing, both the current text and the proposal land on NSF/ANSI 350. A design that documents its end uses, exposure and water quality targets today will be easier to review under either framework, and easier to adapt if a later edition is adopted.
The proposal’s own background is worth knowing for owners. Its reason statement says a version “was presented in 2020 and rejected,” and lists the earlier objections it tried to answer, including unclear definitions of greywater and blackwater, how a code official would enforce odor control, and the view that “wastewater reuse should be governed locally, not in ICC code.”
A plan review checklist for a greywater system
Before a design goes to the building department, check it against the points a reviewer will check. The table gathers them, with the source for each, so a designer can show where every requirement is met.
| Check | What to show on the drawings or in the submittal | Where it comes from |
|---|---|---|
| Edition and amendments | The plumbing code edition the jurisdiction enforces, and any local amendments | Local adoption; ICC Mississippi page |
| Sources | Only showers, tubs, lavatories, clothes washers and laundry trays on the collection drain; prohibited sources on the sanitary drain | 2024 IPC text as reprinted by ICC; EPA; FEMP |
| Treatment unit | NSF/ANSI 350 listing, class (R or C), source water and rated daily capacity | Section 1302.6.1; NSF listings |
| Disinfection and filtration | Disinfection method; chlorine at or below 4 ppm at the point of use; 100-micron or finer filter for flushing | Sections 1301.2.1 and 1301.2.2 |
| Storage time | Untreated greywater held no more than 24 hours; drain-down controls; overflow to sanitary drain | Section 1302.6; ICC Code Essentials |
| Make-up water | Air gap, or a reduced pressure principle assembly where a physical connection is needed | Section 1301.5 and Section 608 |
| Labels and signs | Outlet signs, nonpotable pipe identification, tank capacity and contents labels, confined space marking | Sections 1301.3 and 1301.9.9; FEMP |
| Buried piping | 5 feet of undisturbed or compacted earth from potable piping and the building sewer | Section 1301.11 |
| Pressure | Pressure-reducing valve where pumps exceed 80 psi static | 2024 IPC text as reprinted by ICC |
| Tests and manual | Pipe and tank tests, make-up and control tests; a hardcopy operations and maintenance manual | 2024 IPC text as reprinted by ICC; FEMP |
| Health authority | Any testing or monitoring the local health department requires | ICC Code Essentials; local rules |
Questions to settle with the building official early
A short meeting before design saves redesign later. Bring a one-page description and ask:
- Which plumbing code edition do you enforce, and have you amended Chapter 13?
- Will you accept an NSF/ANSI 350 Class C unit for this building’s daily flow, and in what configuration?
- Does the health department need to review the system, and will it require water quality testing at start-up or on a schedule?
- Which backflow device do you require on the make-up connection, and who tests it?
- What color, label text and spacing do you require for nonpotable piping?
- Do you require an engineer’s seal on the drawings?
- What tests do you want to witness before the system goes into service?
Record the answers in writing. They become the code path memo that travels with the design, the bid package and the operating manual.
How code compliance fits into whether a system is worth building
Code requirements add cost: separate drains and supply piping, a listed treatment unit, a backflow assembly, labels, tests and a manual. Those costs are easiest to absorb in new construction, where FEMP notes “the dual plumbing system can be integrated into the design with less labor than if retrofitted.” The site’s builders and developers page covers planning reuse-ready plumbing, and greywater toilet flushing explains how a compliant system works from drain to bowl. Whether the result pays for itself is a separate calculation, worked through in is greywater recycling worth it.
What to do next
Start with the building and the jurisdiction, not the equipment. Count occupants and flushes in the greywater calculator, confirm the code edition and the health department’s role with the local office, and then decide whether a design is worth paying for. Maredes designs greywater recycling systems with a written code path memo, specifies treatment units by NSF/ANSI 350 class and capacity, and hands the drawings to licensed plumbing contractors for permits and installation; where a local authority requires an engineer’s seal, a licensed engineer provides it. Other articles on codes and rules are collected in the water rules section, and questions about a specific project can go through the contact page.