Standards and rules: certification, codes and policy
For anyone reading a certification mark, a federal limit, a plumbing code or a utility notice and wanting to know what it actually says.
For: Owners, managers, builders and anyone reading a water rule or a label

Standards and rules: 5 articles
Each article carries an issue date from the editorial calendar.
- Issue:
Greywater and plumbing codes: what IPC Chapter 13 requires
What does the plumbing code require for a greywater or rainwater reuse system inside a building?
- Issue:
Why boil water notices are issued and what it takes to lift one
Why do water systems issue boil water notices, who issues them in Mississippi, and what testing is needed before they are lifted?
- Issue:
Is it legal to collect rainwater or reuse greywater in Mississippi?
Can a Mississippi home or business legally collect rainwater or reuse greywater, and which permits or codes apply?
- Issue:
Jackson's water system in 2026: federal order, rates and transition plan
Who runs Jackson's water system in 2026, what has the federal order changed, and what does the transition plan propose after JXN Water?
- Issue:
NSF/ANSI 42, 53, 58 and 401: what water filter certifications mean
What do NSF/ANSI 42, 53, 58 and 401 certifications on a water filter mean, and how do you check a product's actual claims?
Water rules change, and many of them are changing now. Under EPA’s drinking water regulations, the lead action level for water systems falls from 15 to 10 ppb on November 1, 2027. On May 18, 2026, EPA proposed keeping its PFOA and PFOS limits, with an option for systems to request two more years to 2031, and rescinding the limits for PFHxS, PFNA, HFPO-DA and the Hazard Index mixture; both are proposals, not final rules. Mississippi is not on EPA’s list of states with onsite reuse rules. And on October 15, 2026, JXN Water shared a transition plan for Jackson’s system that requires court approval at every step. This section explains what such rules say, with the date each fact was checked.
What this section covers
- Certification. What NSF/ANSI 42, 44, 53, 55, 58, 61, 350, 372 and 401 cover, why a certification is claim-specific, and how to confirm a product in the certifier’s listing rather than on the box.
- Federal drinking water rules. Maximum contaminant levels, action levels, treatment techniques and secondary standards, what Consumer Confidence Reports must contain, and what applies to public water systems but not to private wells.
- Plumbing codes for non-potable water. How Mississippi adopts codes, where enforcement is local, the International Plumbing Code’s chapter on non-potable water systems, backflow protection and purple pipe.
- Licensing and permits. Which contractors must be licensed in Mississippi and who pulls permits.
- Mississippi and Jackson. MSDH notices and reports, the court-ordered management of Jackson’s water system since November 29, 2022, rates and their effective dates, stated as dated facts without commentary.
Who it is for
Owners and managers checking a claim, builders and design teams planning reuse, and residents who want the primary document rather than a summary. Articles describe rules and cite them; they are not legal advice, and local rules apply.
Related services and tools
The standards page lists what Maredes specifies on every design, and the Jackson and Mississippi page gathers dated regional facts. The water test reader compares results with current EPA limits. For new buildings, see builders and developers and system design. How the journal checks its sources is on the editorial team page.
Start with a water review.
Tell us about the building: what it is, who uses it, where the water comes from and what you would like to change. We reply with questions and a time to walk the building with you.