Monitoring and service after start-up
Start-up verification, scheduled filter, membrane and UV lamp changes, readings, sampling and plain-language reports for systems Maredes designed.
For: Owners and managers of a treatment or reuse system Maredes designed

A treatment or reuse system keeps doing its job only while someone changes the cartridges, cleans the screens, replaces the lamps and reads the gauges. EPA’s filter fact sheet puts it in one line: “Filters are only effective if they are maintained.” Monitoring and service is the last stage of every Maredes project. It begins with verification at start-up and continues under a written service plan, so the system you paid for keeps matching its specification.
Start-up and verification
When the licensed contractor has finished, Maredes checks the installation against the drawings and the specification before the system goes into regular use. That visit covers:
- flushing new lines and filters, and setting each unit: softener hardness and regeneration, reverse osmosis pressures, UV operation, tank levels and pump controls;
- for reuse, checking the backflow protection on every make-up connection, the purple piping labels, the overflow and the disinfection step;
- verification samples taken at the same taps as the baseline and sent to a laboratory certified for drinking water, then compared with the original results;
- a start-up and verification report, an operating manual, the first maintenance log entries, and a walk-through with the staff who will look after the system.
What a service plan covers
| Task | When it happens |
|---|---|
| Cartridge changes | At rated gallons or months, whichever comes first |
| Reverse osmosis membranes | On the manufacturer’s schedule, or when output or flow drops |
| UV lamps and sleeves | Lamps on the manufacturer’s schedule; sleeves cleaned at each visit |
| Softener | Salt checked; settings reviewed after any new hardness test |
| Reuse screens, strainers and tanks | As the design sets, more often for laundry lint |
| Readings | Pressure across filters, reuse flow meters, tank levels, and UV intensity or disinfectant residual where fitted |
| Sampling | As the design’s monitoring plan sets, by a certified laboratory |
| Reports | Periodic, in plain language |
Each report says what was done, what was measured, how many gallons the reuse meters recorded, which parts were changed, any sample results with the laboratory’s report attached, and anything outside its limit with what was done about it. Where the equipment can send readings remotely, the plan says who receives them and how quickly they are acted on. Maredes does not offer around-the-clock emergency response; urgent plumbing problems go to your licensed plumber.
Why reuse systems need it most
Stored water changes. EPA recommends disinfection “for all water used indoors for toilet flushing or other uses”, notes that condensate “can grow bacteria”, and advises that untreated greywater be used within 24 hours. A reuse system that loses its disinfection or sits unused can become a problem in the building rather than a saving.
The CDC states that “an effective water management program is the primary strategy to control Legionella growth and spread”, and its guidance lists seven steps, from establishing a team to documenting and communicating the program. Every reuse system Maredes designs is described for the building’s program team, with its control limits, its readings and what to do when a reading is out of range. The service plan supplies the readings. The Legionella checklist shows the structure. Maredes does not certify a building’s program or claim compliance with any standard for it.
Drinking water points in food service
MSDH’s 2016 guidelines for food facilities ask operators to flush drinking water points before first use each day and to maintain ice machine and dispenser filters as the manufacturer directs. A service plan for a restaurant or hotel kitchen puts those filters on the same schedule as everything else. After a boil-water notice, lines are flushed and cartridges that took in water during the notice are replaced, as the boil-water notice checklist sets out. For current notices, check JXN Water and MSDH.
The maintenance log
Every task goes into a log kept with the system, with the date, the equipment, the task, the reading or part, who did it and when it is next due. The filter maintenance log is a printable version, and the filter life calculator sets cartridge intervals.
Example (fictional). The filter maintenance log opens with sample rows like these:
| Date | Equipment | Task | Reading or part | Done by | Next due |
|---|---|---|---|---|---|
| 2026-11-02 | Kitchen RO unit | Cartridge change | Sediment and carbon prefilters | Front desk lead | 2027-05-02 |
| 2026-11-02 | Kitchen RO unit | Pressure reading | Inlet 58 psi | Front desk lead | 2026-12-02 |
| 2026-11-09 | Laundry recycling skid | Inspection | Strainer cleaned | Maintenance tech | 2026-11-16 |
| 2026-11-16 | Laundry recycling skid | Water sample | Turbidity sample sent to lab | Maintenance tech | 2026-12-16 |
At the fictional Pearlbank Hotel, start-up runs from day 111 to day 120 of the plan: flushing, settings, verification sampling compared with the day 3 baseline (kitchen tap, laundry supply, one condensate drain), and the first log entries. The service plan then covers the laundry rinse recycling equipment and the rain and condensate tank, and the reuse meters show whether the planned 1,300 gallons a day of city water replaced holds up. These are planning assumptions, not results.
Who it is for, and what you provide
A service plan applies to systems Maredes designed. For other equipment, we start with a water review so we know what we are looking after. You provide access on the scheduled days, one contact, meter readings where staff take them, and notice of changes: renovations, outages, coil cleaning, a new chemical supplier or a boil-water notice. You receive the schedule, the log, the reports and the laboratory results. Fees are quoted in writing before the plan starts; see engagements.
Owners with an installed system write to support@maredes.com. Maredes does not analyze samples itself (certified laboratories do), does not run chemical treatment programs for cooling towers or boilers, does not do plumbing repairs (licensed contractors do), and does not give medical advice.
Start with a water review.
Tell us about the building: what it is, who uses it, where the water comes from and what you would like to change. We reply with questions and a time to walk the building with you.