Maredes homeRequest a water review
Menu

Filter and system maintenance log

One line per task: the date, the equipment, what was done, the reading or part, who did it and when it is due again. Print it for the equipment room.

For: Homeowners, maintenance staff and managers of buildings with treatment or reuse equipment

An adjustable steel wrench and a spare black rubber O-ring rest on a stone ledge at the waterline, the wrench handle dry above and its jaws below the surface.

Worksheet

The rows are a fictional example. Edit any cell, add or remove rows, then download a CSV or print the log for the equipment room. Nothing leaves your browser.

DateEquipmentTaskReading or partDone byNext dueRemove

Treatment equipment works only as well as its upkeep. A cartridge past its rating, a UV lamp past its life or a softener out of salt gives no warning at the tap. A log is the simplest defense: one line for every task, with the date it is due again. This worksheet is for homeowners with a filter or softener, maintenance staff in hotels, apartments and restaurants, and managers of any building with treatment or reuse equipment.

Why a log matters

EPA’s fact sheet on home filters says it plainly: “Filters are only effective if they are maintained.” EPA’s lead guidance adds that a filter certified to remove lead needs its cartridges replaced on schedule. For food service, MSDH’s guidelines for food facilities ask operators to maintain ice machine and dispenser filters according to the manufacturer. For reuse systems, EPA recommends disinfection for all water used indoors, and disinfection has to be checked to be relied on. And where a building has a water management program, CDC’s last step is to document and communicate all the activities. A log is how all of these become something you can show.

How the worksheet works

The table has six columns:

  • Date the task was done.
  • Equipment: name each unit the same way every time (“Kitchen RO unit,” “Laundry recycling skid”).
  • Task: chosen from a list: cartridge change, membrane change, UV lamp change, sanitize housing, pressure reading, water sample, salt added, inspection.
  • Reading or part: the cartridge model, a pressure, a meter reading, or what was sent to the laboratory.
  • Done by: a name or a role.
  • Next due: the date the task comes around again.

Edit any cell, add or remove rows, then print the log for the equipment room or download it as a CSV file to keep in a spreadsheet. Everything stays in your browser, and nothing is saved between visits, so download or print before you close the page.

The example rows

Example (fictional). The worksheet opens with four fictional rows from a building with a kitchen reverse osmosis unit and a laundry recycling skid:

Date Equipment Task Reading or part Done by Next due
2026-11-02 Kitchen RO unit Cartridge change Sediment and carbon prefilters Front desk lead 2027-05-02
2026-11-02 Kitchen RO unit Pressure reading Inlet 58 psi Front desk lead 2026-12-02
2026-11-09 Laundry recycling skid Inspection Strainer cleaned Maintenance tech 2026-11-16
2026-11-16 Laundry recycling skid Water sample Turbidity sample sent to lab Maintenance tech 2026-12-16

The prefilter change comes due again in six months, the pressure check monthly, the strainer weekly and the sample monthly. Replace these rows with your own.

What to record for each kind of equipment

Equipment Record each time Where the interval comes from
Cartridge filters Cartridge model, date, meter reading or gallons, pressure before and after The filter life calculator: gallons or months, whichever comes first
Reverse osmosis Prefilter and membrane changes, inlet pressure The manufacturer’s manual
UV units Lamp change date, sleeve cleaning The manufacturer’s manual
Softeners Salt added, regeneration setting The softener sizing calculator and the maker’s table
Reuse systems Strainer cleaning, disinfectant checks, tank inspections, samples sent The design’s operating manual and the building’s water management program

Add a line after anything unusual: a boil-water notice (see the boil-water notice checklist), a flood, a repair or a change in taste or pressure. Those lines explain later readings.

Limits and next steps

A log records what was done; it does not test the water. Sampling still goes to a certified laboratory, and the results belong with the log. Buildings with a water management program should file the log where the program team can see it; the Legionella checklist shows where reuse equipment fits.

Every Maredes design that reaches installation comes with a monitoring and service plan and a maintenance log, and a service plan can keep the log for systems Maredes designed. Owners with an installed system can write to support@maredes.com. Engagements explains how service fits after start-up.

Start with a water review.

Tell us about the building: what it is, who uses it, where the water comes from and what you would like to change. We reply with questions and a time to walk the building with you.